Requirements
Atomic, testable requirement records, written on a DRP's Requirements module, owned by the project, and reusable in every DRP that needs them. One of several modules whose content shapes a DRP's requirements.
Project-level content, linked into DRPs
A requirement is written on a DRP's Requirements module, but it belongs to the project rather than to that one DRP. Linking it into a DRP simply says "this DRP uses this requirement" — the link itself carries no review state. Sign-off happens once, on that DRP's Requirements module, covering its narrative summary and its whole linked set together, exactly like every other module.
There is one shared record, so a requirement reads the same in every DRP that uses it. To stop its wording changing underneath a pack that may already be in review or signed off, a requirement can only be edited while no DRP uses it. Try to edit one that is linked and Requio says which DRPs use it — for example "This requirement is linked to 2 DRPs (Payments Phase 1, Payments Phase 2), so it cannot be edited. Unlink it there first if the wording needs to change."
Every requirement shows one of three statuses:
- Draft — it still has a temporary reference, such as REQ-TMP-004.
- Complete — it has its permanent reference, because a DRP using it finished its Requirements section, but no approver has signed it off. On a project with review switched off, which is the default, finished requirements read Complete.
- Approved — an approver signed off a Requirements section that uses it. It stays Approved if that section is later reopened, because a requirement's wording cannot change while a DRP uses it. Editing it, which is only possible once it is unlinked everywhere, takes it back to Complete.
A Requirements section finished with Mark Complete as an override, shown as "Approved (override)", leaves its requirements Complete: nobody approved them. See "Temporary and permanent references" below for how the permanent reference is given.
Using a requirement from another DRP
Because requirements belong to the project, a requirement captured while working on one DRP can be used by any other DRP in the same project. There is no need to write it again.
- 1Open the DRP that needs the requirement and go to Modules, then Requirements.
- 2Click "Manage requirements". A window titled "Requirements in this project" lists every requirement in the project in full, including ones first written while working on another DRP. The ones this DRP already uses are marked "In this DRP", and a search box finds one by title, description, ID or tag.
- 3Click "Link to this DRP" on the one you want. It appears in the Linked Requirements table straight away.
The linked requirement is the same record in both DRPs, not a copy, which is why it can no longer be edited once it is in use: a change would rewrite it in both packs at once.
Sharing only works within one project. A requirement from a different project can't be linked; write it in that project instead.
Temporary and permanent references
A requirement starts life with a temporary reference — REQ-TMP-001 — and earns a permanent one (REQ-001) the first time a DRP that uses it finishes its Requirements module: either approved by its approver or, where that module needs no sign-off, marked complete. Numbering runs per project, and the prefix is configurable per workspace.
When a requirement gets its permanent reference, Requio updates everywhere in that DRP that quoted the temporary one — table columns such as Test Cases' Linked Requirement ID, references written into ordinary sentences in any section ("see REQ-TMP-001" becomes "see REQ-001"), and user story references such as REQ-TMP-001-UA-1, which becomes REQ-001-UA-1. Only whole references are changed, so nothing else you wrote is touched.
A permanent reference is never revoked, whatever later happens to that DRP. Once a reference has been signed off it may already be quoted in a Test Case, the Traceability Matrix, or somewhere outside Requio entirely.
Taking a requirement out again
Two different things, side by side on each requirement in the "Manage requirements" window. "Unlink from this DRP" takes the requirement out of this DRP and leaves it in the project, ready to be used somewhere else. "Delete" removes it from the project entirely.
Neither quietly takes anything else with it. Where something would be lost, Requio stops, says exactly what is in the way, and offers the destructive version as a separate, clearly worded choice:
- Unlinking is refused while the requirement still has user stories in this DRP, and the refusal names them — for example UA-4 and UA-7. "Unlink and delete those stories" then removes the link and those stories together.
- Deleting is refused for a requirement linked to any DRP at all. The refusal names every DRP it is linked to and every user story that would be destroyed with it, and offers "Unlink everywhere and delete" as one deliberate action.
- A requirement used by a DRP whose Requirements section has been sent for review, is waiting for approval, or is approved or complete cannot be deleted at all, and there is no way to override that — the set being signed off must not change underneath the people signing it. Requio names each of those DRPs and its state, for example "Payments Phase 1 (being reviewed)". To take it out, open that DRP's Requirements module, press "Reopen to edit" (which clears its sign-off in the open), and unlink it there first.
Where user stories live
User stories and acceptance criteria are not part of a requirement. They belong to the User Stories & Acceptance Criteria module, per DRP — so one requirement can be decomposed into several stories, and decomposed differently in each DRP that uses it. See that module's guide page for how to write them.
This is why unlinking and deleting are refused when stories exist — see "Taking a requirement out again" above for what each refusal says and what it offers instead.
Seeing every requirement in the project
Projects, then Requirements, lists every requirement in the project in one place — whichever DRPs they are linked to, and which those are — with a search box for finding one by title or ID. It is a place to read across the whole project rather than to work in: apart from starting a brand new requirement, the adding, linking, editing and removing all happen on each DRP's Requirements module.
It is also where requirements leave Requio. "Export" offers a plain Spreadsheet, or a file shaped for a Jira or an Azure DevOps import — the two import files carry the acceptance criteria from the User Stories & Acceptance Criteria module along with each requirement.